Clarification On Rule resoluion Question's Answer

Hi Team,

 

Could you please clarify this question. In rule resolution there are 2 questions both are same. But answer it is showing different? Please clarify

Question 1:

Consider the following scenario:
The PIPFW application has the following application RuleSets:
 

PIPFW:01-01
PIPFWInt:01-01
LES:01-01
LESCatalog:01-01
LESInt:01-01
A rule with an applies-to class of “ABC-FW-LoanReq-Work-Autoloan” calls “Rule123”.  There are 9 copies of Rule123 in the system as shown below.

Option A: ABC-FW-LoanReq-Work, PIPFW:01-01-05, Availability = Withdrawn
Option B: ABC-FW-LoanReq-Work, PIPFW:01-01-03, Availability = Yes
Option C: ABC-FW-LoanReq-Work, LESCatalog:01-01-05, Availability = No/Draft
Option D: ABC-FW-LoanReq-Work, LESCatalog:01-01-03, Availability = Blocked
Option E: ABC-FW-LoanReq-, PIPFW:01-01-05, Availability = Withdrawn
Option F: ABC-FW-LoanReq-, PIPFW:01-01-03, Availability = Final
Option G: ABC-FW-LoanReq-, LESCatalog:01-01-05, Availability = Yes
Option H: ABC-FW-LoanReq-, LESCatalog:01-01-03, Availability = Yes
Option I: @baseclass, Pega-RULES:07-10-99, Availability = Yes 

 

Ans: D,Error occured

 

----------------------------------------------

 

Question 2:

Consider the following scenario:
The PIPFW application has the following application RuleSets:
 

PIPFW:01-01
PIPFWInt:01-01
LES:01-01
LESCatalog:01-01-01
LESInt:01-01
A rule with an applies-to class of “ABC-FW-LoanReq-Work-Autoloan” calls “Rule123”.  There are 9 copies of Rule123 in the system as shown below.

Option A: ABC-FW-LoanReq-Work, PIPFW:01-01-05, Availability = Withdrawn
Option B: ABC-FW-LoanReq-Work, PIPFW:01-01-03, Availability = Yes
Option C: ABC-FW-LoanReq-Work, LESCatalog:01-01-05, Availability = No/Draft
Option D: ABC-FW-LoanReq-Work, LESCatalog:01-01-03, Availability = Blocked
Option E: ABC-FW-LoanReq-, PIPFW:01-01-05, Availability = Withdrawn
Option F: ABC-FW-LoanReq-, PIPFW:01-01-03, Availability = Final
Option G: ABC-FW-LoanReq-, LESCatalog:01-01-05, Availability = Yes
Option H: ABC-FW-LoanReq-, LESCatalog:01-01-03, Availability = Yes
Option I: @baseclass, Pega-RULES: 07-10-99, Availability = Yes

 

Ans: I,No error raised.

 

 

Which is right answer....

 

D,Error raised will be the aswer for both right..

 

Please provide your valuable comments