Discussion

7
Replies
287
Views
Benjamin Hui (BenjaminHui)
CGI
Pega Practice Lead
CGI
US
BenjaminHui Member since 2011 18 posts
CGI
Posted: March 30, 2020
Last activity: April 3, 2020
Posted: 30 Mar 2020 12:09 EDT
Last activity: 3 Apr 2020 6:35 EDT
Closed

Data Page Loading Activity and temporary page

Hi,

I am using Pega 7.1. I have a node level data page with parameter that is used in very high volume. The DP is loaded using an activity and inside the activity, I create a temp page to manipulate the data and eventually copy into the data page. Since the system is very high volume, if there are two instance of the same data page being loaded at the same time, will there be collision because they are using the same temp page?

Thanks

Ben

Pega Platform 7.1.3 Data Integration Senior System Architect
Moderation Team has archived post, This thread is closed to future replies. Content and links will no longer be updated. If you have the same/similar Discussion, please write a new Discussion.