Discussion

5
Replies
70
Views
RahulN92 Member since 2015 3 posts
Yash Technologies Pvt. Ltd
Posted: October 30, 2015
Last activity: November 17, 2015
Closed

Unable to run Two subacases

Hii,
I have two subcases in my case.One of them is in Stage 1 and other is in Stage 2.But only second subcase is routed through while running the case.And If I am using both the subcases in the same stage only the subcase which is earlier,runs.Can anyone suggests a solution If i would like to have the option of running whichever subcase i want to run during the flow of the main case.

Pega Academy
Moderation Team has archived post
Share this page LinkedIn