Discussion

4
Replies
160
Views
Damianos Dorizas (DamianosD)
Cisco Systems
CSSA 7.1
Cisco Systems
FR
DamianosD Member since 2013 5 posts
Cisco Systems
Posted: March 21, 2016
Last activity: March 31, 2016
Posted: 21 Mar 2016 14:29 EDT
Last activity: 31 Mar 2016 3:50 EDT
Closed

VBD quiz

In the followin quiz, I selected "The value of the KPI in the reference simulation is smaller than the value in source", but it was marked incorrect. Am I right to believe that my answer agrees with the explanation, and therefore should be considered as correct?
 
In VBD, when comparing the results of simulations reference and source the red colour indicates (Choose One)
The value of the KPI in the reference simulation is greater than the value in the source simulation
There was an error during the evaluation of reference KPI
The value of the KPI in the reference simulation is smaller than the value in source
There was an error during the evaluation of source KPI
Sorry, this is incorrect.
We compare against a reference (baseline simulation). Red indicates a drop in a value of a KPI
Pega Academy
Moderation Team has archived post, This thread is closed to future replies. Content and links will no longer be updated. If you have the same/similar Discussion, please write a new Discussion.