Question

1
Replies
8
Views
Shane Sody Member since 2018 16 posts
CR England
Posted: 1 year ago
Last activity: 1 year 6 months ago
Closed
Solved

Automation Grid Properties

In the process of fixing a clients bot, I have to untangle the automations. One of these automations was so large that it exceeded the grid size. I only noticed this because after reopening the automation, 95% of the design blocks where missing. I then learned that I could increase the grid size for that automation and that would prevent the loss of data. My question is a little open ended, but I was wondering what potential issues could be created by increasing the grid size for an automation? This question is mostly to help me identify if I need to allocate time to break up the automation into smaller automations or if I can leave it as is until after I get past my deadline.

Robotic Process Automation
Moderation Team has archived post
Share this page LinkedIn