Question

2
Replies
82
Views
Close popover
Wu Zhixian (Kite_Wu)
Accenture

Accenture
CN
Kite_Wu Member since 2016 11 posts
Accenture
Posted: February 16, 2020
Last activity: February 17, 2020
Closed

ChangeStage between two stages does not work as expected

steps (v7.3.1)                                      

1.case in Assignment1(Stage1):finish Assignment1,case change to stage2                    

2.case in Assignment2(Stage2):change stage to stage 1 by activity which calls pxChangeStage with the param.CleanUpProcesses true.                                    

3.case in Assignment1:finish Assignment1,case change to stage2                    

4.case has been performed to Stage2.But the status has not been changed and the assignment was removed.   Audit history:Unfinished assignments were cleaned up by the system after the completion of stage2.

I have try to change the step2's activity to changeStage shape but got the same result.

Please check ChangeStage.xlsx for details.

Thanks a lot.

Case Management Technology Services
Moderation Team has archived post,
Close popover This thread is closed to future replies. Content and links will no longer be updated. If you have the same/similar Question, please write a new Question.