Question

6
Replies
215
Views
sharath potla (sharathp7997)
Accenture

Accenture
US
sharathp7997 Member since 2017 7 posts
Accenture
Posted: May 22, 2020
Last activity: June 18, 2020
Posted: 22 May 2020 8:57 EDT
Last activity: 18 Jun 2020 9:35 EDT
Closed
Solved

Drill down option for chart control.

We have a requirement to show a Pie Chart in Dashboard, and user will get the drill down data in report format once clicked on a wedge. However I could not find how to do it using Chart control using report definition as a data source in Pega7.4 version.

I found below post in PDN addressing similar issue, But my pega varsion is pega 7.4. So, I would like to know if there is any fix provided in 7.4 version or should I install same hotfix ?  

https://collaborate.pega.com/question/how-add-interactive-charts-drill-down-sectionharness

 

 

***Edited by Moderator Marissa to update Platform Capability tags****

Pega Platform 7.4 Case Management Reporting
Moderation Team has archived post, This thread is closed to future replies. Content and links will no longer be updated. If you have the same/similar Question, please write a new Question.