Question

1
Replies
813
Views
Close popover
China Chiranjeevi Kothi (Chiranjeevi12)
Capgemini
Consultant
Capgemini
IN
Chiranjeevi12 Member since 2014 29 posts
Capgemini
Posted: November 27, 2017
Last activity: November 27, 2017
Closed

How Should the System Handle the Locking of the Work Object ?

My question is, I hv a Advanced Agent which is running on multiple nodes. Nodes like N1, N2, N3.

Assume that Agent running on Node N1 picked up an work object W-1, If Node N2 Agent is tries to pick up same work object. Then how system should handle the locking of the Work Object ?

As per my knowledge there is no auto locking with Advanced agent.

Thanks in advance!!!

System Administration
Moderation Team has archived post,
Close popover This thread is closed to future replies. Content and links will no longer be updated. If you have the same/similar Question, please write a new Question.