Question about scheduled agent

An agent is configured to run every 300 seconds (5 minutes) with a maximum entries of 10. There are 15 entries in the schedule. When does the agent run again if it's set to run first time at 12am?

Answer 1: 300 seconds AFTER the agent processes 10 entries. Assume the agent took 2 minutes to finish processing 10 items (meaning 5 are left in the queue) So it's 12.02am + 5 min = 12.07am

OR

Answer 2: At 12.05 am regardless of whether the agent manage to process 10 or less entries