Question

2
Replies
1030
Views
Close popover
KARTIK ANAND (KARTIKA9)
GALAXE SOLUTIONS PVT. LTD.

GALAXE SOLUTIONS PVT. LTD.
IN
KARTIKA9 Member since 2016 2 posts
GALAXE SOLUTIONS PVT. LTD.
Posted: April 4, 2017
Last activity: April 5, 2017
Closed

Single or multiple Scenario for using different methods in activity

Following are 18 methods that I need to use in activity for scenario (max 2):

Call, Branch, Java, Activity-Set-Status, Activity-Clear-Status, Activity-End, Exit-Activity, Commit, Flow-New, Flow-End, Obj-Filter, Obj-Open, Obj-Open-By-Handle, Obj-Save, Obj-Save-Cancel, Page-Merge-Into, Property-Set-Corr, Show-Property.

Here scenario could mean like I want to send collect information from end user, save them in DB and display at UI and simultaneously send an email notification (this is an example scenario but could not use most of methods in this). Kindly Suggest.

***Updated by moderator: Lochan to update Categories***

Data Integration System Administration
Moderation Team has archived post,
Close popover This thread is closed to future replies. Content and links will no longer be updated. If you have the same/similar Question, please write a new Question.