Question

1
Replies
41
Views
Mathew_George Member since 2016 5 posts
Infosys
Posted: March 27, 2017
Last activity: April 6, 2018
Closed

Upgrade with High Availability

We came across a requirement of pega upgrade from 6.3 to 7.2. Client need to enable OOB High Availability of Pega 7 along with upgrade.

a) How to estimate for High Availability (Ignoring Infrastructure efforts) ?

b) Pega provides any standard Infrastructure topology for High Availability ?

Thanks in advance.

**Moderation Team has archived post**

This post has been archived for educational purposes. Contents and links will no longer be updated. If you have the same/similar question, please write a new post.

Low-Code App Development Upgrades
Moderation Team has archived post
Share this page LinkedIn