Question

3
Replies
75
Views
JonV6881 Member since 2014 4 posts
Department of Defence
Posted: 4 years ago
Last activity: 4 years 7 months ago
Closed

What are the best approaches for upgrading the operating system that a pega prpc node resides on?

Hi,

I have a PEGA PRPC node (7.1.8) that resides on a host running Red Hat 6.6. I would like to take the host to Red Hat 7.x. Is there a document indicating what the approaches are for doing this? For example are any/all of the options below valid?


Options

a) Upgrade the operating system in-place.

b) Set up a second node running Red Hat 7 (I'm presuming cluster nodes can be on different OSs - just need PEGA to be at the same version) and then drop the first node

c) Just set up a new host, copy the software that has the prpc files across (i.e. /apps/tomcat) and then start up pega (any issues with node ids?)?

Am I missing any other possibilities?  Thanks.

Jon.

Low-Code App Development Upgrades System Administration
Moderation Team has archived post
Share this page LinkedIn