Question

2
Replies
86
Views
kasibondada Member since 2013 2 posts
NTTDATA
Posted: 10 months ago
Last activity: 3 months 4 weeks ago

how to reduce Job Scheduler interval time less then one min for Multiple times a day

As per our current requriment we have to run backroung job for every 5 sec but in job schedular we have limitation of one minit interval time.
previously we can achive the same by using advanced agents. How we can achive the same in 8 version.

Thanks

***Edited by Moderator Marissa to update platform capability tags****

Pega Platform System Administration
Share this page LinkedIn