Question

2
Replies
95
Views
Shrikanth Nekkanti (ShrikanthN5808)
Navistar Inc

Navistar Inc
US
ShrikanthN5808 Member since 2020 5 posts
Navistar Inc
Posted: June 11, 2020
Last activity: June 12, 2020
Posted: 11 Jun 2020 11:49 EDT
Last activity: 12 Jun 2020 13:35 EDT
Closed

Optimistic locking issue

Optimistic locking is configured for our case type. We are displaying list of active cases on a user portal in a repeating grid. When user click on any particular row, a modal window opens up and displays the details. 

On Submit button we are calling an activity to open the WO and perform a validation, if validation is successful, resuming a flow.

The problem is, when user clicks on the link in the repeating grid, a lock is getting created in pr_sys_locks. This is causing other users from submitting changes through modal window.

Any thoughts?

Pega Platform 8.3 Case Management Manufacturing Lead System Architect
Moderation Team has archived post, This thread is closed to future replies. Content and links will no longer be updated. If you have the same/similar Question, please write a new Question.